MySQL uses what is known as a proleptic Gregorian calendar.
Every country that has switched from the Julian to the Gregorian calendar has had to discard at least ten days during the switch. To see how this works, consider the month of October 1582, when the first Julian-to-Gregorian switch occurred.
Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | Sunday |
1 | 2 | 3 | 4 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |
There are no dates between October 4 and October 15. This discontinuity is called the cutover. Any dates before the cutover are Julian, and any dates following the cutover are Gregorian. Dates during a cutover are nonexistent.
A calendar applied to dates when it wasn't actually in use is
called proleptic. Thus, if we assume there
was never a cutover and Gregorian rules always rule, we have a
proleptic Gregorian calendar. This is what is used by MySQL, as is
required by standard SQL. For this reason, dates prior to the
cutover stored as MySQL DATE
or
DATETIME
values must be adjusted to
compensate for the difference. It is important to realize that the
cutover did not occur at the same time in all countries, and that
the later it happened, the more days were lost. For example, in
Great Britain, it took place in 1752, when Wednesday September 2
was followed by Thursday September 14. Russia remained on the
Julian calendar until 1918, losing 13 days in the process, and
what is popularly referred to as its “October
Revolution” occurred in November according to the Gregorian
calendar.
User Comments
Add your own comment.